A bathroom renovation works best when the trades follow a clear sequence. Trying to tile before plumbing and electrical positions are finalised usually creates unnecessary rework.
1. Strip-out and inspection
Removing the old finishes exposes the condition of walls, floors and services. This is the right time to identify leaks, damaged substrates or layout problems.
2. Plumbing and electrical first fix
Pipework, drains, shower points, sockets, lighting and extraction should be positioned before surfaces are closed.
3. Repair, level and waterproof
Walls and floors should be stable and suitably prepared. Wet areas then need the appropriate waterproofing system before tiling begins.
4. Tiling and finishing
Set-out matters. Starting lines, cuts, joints and falls should be planned before adhesive is spread. Sanitary ware, mixers and accessories can then be installed after the tiled surfaces are ready.